Teys Australia

Biloela
/
2023

Project Summary

Keith designed, manufactured and installed a new Continuous High Temperature Press Processing Area, incorporated into the existing site layout and capable of processing up to 5,400kg/hr of cake. The install provides increased throughput and locally supported Presses to minimise downtime. Civil works and a building extension was included in the project.

Features

  • Incline Crax Drainer Screw
  • Metal Detection
  • Three Bullnose model 1038 Screw Presses
  • Sweeco Tallow Vibrating Screen
  • All crax, fines, tallow, and cake screw conveyors as required, ensuring minimal operator input and manual handling 
  • Electrical equipment, device, and control supply and installation
  • Mechanical Installation
  • Building and civil works

Other Projects

Services

Young

2025

New Raw Material and Particle Reduction equipment to replace end of life equipment.

Services

Tamworth

2025

New Continuous Blood Drying System, capable of producing up to 300kg/hr of Blood Meal. 

Services

Wagga Wagga

2025

Continuous High Temp. Cooker and Meal System, capable of processing up to 20,000kg/hr of bovine material.