Fit out of a new in-ground Raw Material Receivals Area providing a facility for Raw Material to enter the process via truck loading. The project provided a facility for external raw material to be brought onto site, and be processed through the existing Protein Recovery Facility. Equipment was tied in with the existing facility, and the complete installation was carried out with no shutdown or interruption to existing operation.

Young
•
2025
New Raw Material and Particle Reduction equipment to replace end of life equipment.

Tamworth
•
2025
New Continuous Blood Drying System, capable of producing up to 300kg/hr of Blood Meal.

Wagga Wagga
•
2025
Continuous High Temp. Cooker and Meal System, capable of processing up to 20,000kg/hr of bovine material.