Greenham

Tongala
/
2021

Project Summary

Fit out of a new in-ground Raw Material Receivals Area providing a facility for Raw Material to enter the process via truck loading.  The project provided a facility for external raw material to be brought onto site, and be processed through the existing Protein Recovery Facility. Equipment was tied in with the existing facility, and the complete installation was carried out with no shutdown or interruption to existing operation.   

Features

  • 45m³ Raw Material Bin with Hydraulic Lid
  • Large Wrap Around Raw Material Screw Conveyors 
  • Metal Detector
  • Reversing screw
  • Keith Double Anvil Pre-Hog
  • Electrical equipment, device, and control supply and installation
  • Mechanical Installation of all supplied equipment

Other Projects

Services

Young

2025

New Raw Material and Particle Reduction equipment to replace end of life equipment.

Services

Tamworth

2025

New Continuous Blood Drying System, capable of producing up to 300kg/hr of Blood Meal. 

Services

Wagga Wagga

2025

Continuous High Temp. Cooker and Meal System, capable of processing up to 20,000kg/hr of bovine material.

GET IN TOUCH

Chat with our team to learn more

Our team is ready to help.

Get in touch

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.